Skip to content

Industrial products from quotation to final delivery

Pressure vessels, heat exchangers, rubber-lined pipelines and machined parts, made by Swedish and European partners with ISO 9001 quality management. We coordinate production, inspection and documentation.

Send an enquiry See the products

CONING-branded slurry hose installed on a slurry pump.
Title
CONING-branded slurry hose installed on a slurry pump.
Company
CONING project AB
Location
Göteborg, Sweden

One contact for the workshops

In cooperation with reputable Swedish and European companies, CONING project AB offers a wide range of products for industry. We coordinate and take part in every phase of the delivery, from quotation to final delivery.

The right quality based on the customer’s needs and expectations, at competitive prices, is how we build long-term partnerships.

How we handle quality and documentation

ISO 9001
All our partners have quality management systems to ISO 9001.
Third party
For demanding products we use Inspecta, Bureau Veritas, TÜV and others.
Drawings
We complete your enquiry with working drawings, usually by redrawing PDF files as DWG.
Documentation
Material, production and test certificates are supplied with the products.

How a delivery runs

To keep to the delivery date, we follow production from beginning to end.

  1. Enquiry and quotation

    Step 1: Enquiry and quotation

    We review your documents. Where needed, we add working drawings, usually by redrawing PDF files as DWG. Design work and calculations can be included in our scope.

  2. Kick-off and schedule

    Step 2: Kick-off and schedule

    Most deliveries start with a kick-off meeting and a schedule that covers everything from material purchasing to loading and shipping.

  3. Production

    Step 3: Production

    We stay in continuous contact with the manufacturer and keep you updated on how production is progressing.

  4. Inspection

    Step 4: Inspection

    The quality and inspection plan meets the requirements of the technical specifications and standards for the order. For demanding products we use accredited inspection bodies.

  5. Documentation and delivery

    Step 5: Documentation and delivery

    The technical documentation is completed according to the client’s instructions and supplied both on paper and electronically.

A selection of applied standards

For more demanding products we use external accredited inspection bodies such as Inspecta, Bureau Veritas and TÜV.

How we handle quality and documentation

  • EN ISO 9001 Quality management systems
  • ISO 14001 Environmental management systems
  • PED 2014/68/EU Pressure Equipment Directive
  • EN ISO 3834-2 Quality requirements for fusion welding – comprehensive requirements
  • EN ISO 5817 Welded joints in steel – quality levels for imperfections
  • EN 13445 Unfired pressure vessels
  • EN 10204 3.1 Material certificate
  • EN ISO 8501-1 Preparation of steel surfaces before painting
  • EN ISO 12944 Corrosion protection of steel structures by paint systems

Contacts on the international market

CONING project AB also helps Swedish companies establish contacts on the international market.

Do you have a drawing or a specification?

Send us the documents and we will come back with questions or a quotation. PDF, DWG and STEP files are fine.

Call Email Request a quote

Cookie settings

Choose which cookies you allow. You can change your choice at any time. Withdrawing consent does not affect the lawfulness of processing before the withdrawal. We do not use cookies for advertising.

Necessary cookies

Always on

Needed for the website to work securely and to remember your cookie choice. They cannot be switched off and do not require consent.

List of cookies (2)
CookieProviderPurposeDuration
coning_samtyckeconing.s.com.hrStores your cookie choice and when consent was given.365 days
wordpress_logged_in_*, wordpress_sec_*, wordpress_test_cookie, wp-settings-*coning.s.com.hrLogin and settings for site editors. Only set for people who log in to the admin area.Session up to 1 year

Analytics cookies

Google Analytics shows us which pages are read and how visitors find the site. The data is aggregated and not used for advertising.

List of cookies (2)
CookieProviderPurposeDuration
_gaGoogle Ireland Ltd. (Google Analytics)Distinguishes visitors for visit statistics.2 years
_ga_*Google Ireland Ltd. (Google Analytics)Stores session state for visit statistics.2 years