Skip to content

Delivery, quality and documentation

Thanks to an established network of reputable manufacturers and many years of cooperation, we can offer a very wide range of products and services for industry.

How a delivery runs

To keep to the delivery date, we follow production from beginning to end.

  1. Enquiry and quotation

    Step 1: Enquiry and quotation

    We review your documents. Where needed, we add working drawings, usually by redrawing PDF files as DWG. Design work and calculations can be included in our scope.

  2. Kick-off and schedule

    Step 2: Kick-off and schedule

    Most deliveries start with a kick-off meeting and a schedule that covers everything from material purchasing to loading and shipping.

  3. Production

    Step 3: Production

    We stay in continuous contact with the manufacturer and keep you updated on how production is progressing.

  4. Inspection

    Step 4: Inspection

    The quality and inspection plan meets the requirements of the technical specifications and standards for the order. For demanding products we use accredited inspection bodies.

  5. Documentation and delivery

    Step 5: Documentation and delivery

    The technical documentation is completed according to the client’s instructions and supplied both on paper and electronically.

A selection of applied standards

StandardScope
EN ISO 9001Quality management systems
ISO 14001Environmental management systems
PED 2014/68/EUPressure Equipment Directive
EN ISO 3834-2Quality requirements for fusion welding – comprehensive requirements
EN ISO 5817Welded joints in steel – quality levels for imperfections
EN 13445Unfired pressure vessels
EN 10204 3.1Material certificate
EN ISO 8501-1Preparation of steel surfaces before painting
EN ISO 12944Corrosion protection of steel structures by paint systems

Documentation

Products are supplied with the documentation required for materials and workmanship: material, production and test certificates and protocols. The technical documentation is completed according to the client’s technical guidelines and specifications.

Formats

  • Paper
  • PDF
  • DWG
  • STEP
  • Multimedia

Inspection bodies

For more demanding products we use external accredited inspection bodies such as Inspecta, Bureau Veritas and TÜV.

Heat exchanger tubes during third-party inspection

Environment

All our partners have environmental management systems to ISO 14001 and are committed to environmental responsibility. Gumiimpex, which rubber lines the products, has for example installed solar panels with a capacity of 4 MW.

Do you have a drawing or a specification?

Send us the documents and we will come back with questions or a quotation. PDF, DWG and STEP files are fine.

Call Email Request a quote

Cookie settings

Choose which cookies you allow. You can change your choice at any time. Withdrawing consent does not affect the lawfulness of processing before the withdrawal. We do not use cookies for advertising.

Necessary cookies

Always on

Needed for the website to work securely and to remember your cookie choice. They cannot be switched off and do not require consent.

List of cookies (2)
CookieProviderPurposeDuration
coning_samtyckeconing.s.com.hrStores your cookie choice and when consent was given.365 days
wordpress_logged_in_*, wordpress_sec_*, wordpress_test_cookie, wp-settings-*coning.s.com.hrLogin and settings for site editors. Only set for people who log in to the admin area.Session up to 1 year

Analytics cookies

Google Analytics shows us which pages are read and how visitors find the site. The data is aggregated and not used for advertising.

List of cookies (2)
CookieProviderPurposeDuration
_gaGoogle Ireland Ltd. (Google Analytics)Distinguishes visitors for visit statistics.2 years
_ga_*Google Ireland Ltd. (Google Analytics)Stores session state for visit statistics.2 years